Many of us have
experienced projects that drag on much longer than
expected and cost more than planned. Companies
looking to improve their software development
processes are now exploring how Agile can help their
Enterprise more reliably deliver software quickly,
iteratively and with a feature set that hits that
mark. While Agile has different "flavors",
Scrum is one process for implementing Agile.
This newsletter is one in a series of
newsletters that will discuss the Agile Scrum
process and will end with variants of Scrum that can
be used to aid in improving your software releases.
Here are the prior newsletters in this series:
30-Day Sprints
Agile differs from
standard Waterfall development in that development
has a smaller timeframe with a smaller feature set.
Agile Scrum implements releases every 30 days
(called 30 day sprints). In the purest
implementation of Scrum, the 30 days is 30 calendar
days. We have found that 30 working days works
best.
Upon completing a
sprint, you can move the software to production (if
production-ready) or move into another 30 day sprint
to implement additional features.
At the conclusion
of the
PAD Planning Week, you should have a set of
detailed requirements and estimates and the Scrum
Master can create a project plan that contains each
feature (represented by a work order) and the
individual assignments.
The items
that appear in the project plan for the sprint are
referred to the
Sprint Backlog.
Each feature should
have a priority and should be worked in priority
order so that if the team falls behind, you can
ensure the highest priority items make it into the
sprint.
Features
not completed at the end of the sprint will be
reprioritized for possible inclusion in the next
sprint.
Best Practices for 30-Day Sprints
Create Test Cases before Coding Begins
As each
feature is detailed, it is important to create a set
of test cases before coding begins. Developers
should always run all the established test cases
before making the feature available to the Software
Quality Engineer(s) for testing. This approach
will drastically reduce defect count and
significantly speed up the quality assurance
testing.
Daily Code Builds
Each
day, each team member should check their code into
their source control system if their code is
compilable (never check in code that is not
compilable).
If SQL
script changes were made, these also need to be
checked into the source control system.
It is wise to utilize an automated build tool that
can run at
the end of day and will do a GET on all source code
and SQL Script changes that were made.
It can
compile the code into DLLs and run the SQL scripts
to upgrade your database.
This allows
you to have a new build on your quality assurance
server daily so that your Software Quality
Engineer(s) can test new features and run regression
when needed.
There are a number of tools available for automatic
builds, a popular one is
called
Automated Build
Studio
by Automated QA (see it at
http://www.automatedqa.com)
Code Inspection
It
is important to know that code should not be
considered complete until it is fully coded, fully
unit tested, all established test cases have been
run, code has been refactored (if needed), and
technical documentation is written (when needed).
Upon indication that code is complete for a feature,
the team should do a code inspection by reviewing
the code in the source control system related to the
feature. The code review should look for
standards adherence, identification of logic errors
or performance problems, and reusability.
If the code
inspection finds failures, defects should be created
and assigned -- allowing the developer to fix the
issues before the code is tested by the Software
Quality Engineer(s).
Daily Hours Entry
Each
day, every team member should log the hours they
worked on each task during that day.
When logging
time, it is important to enter the percentage
complete or estimated remaining hours (this is the
preferred method).
By entering
the estimated remaining hours for each task worked
on, your team will know how many hours remain for
all tasks and can determine if you are progressing
on a pace to finish the sprint with all the desired
features.
From a metrics perspective, inspect burn down charts
daily.
A burn down chart
is simply a chart that shows day-by-day the number
of estimated hours, actual hours and estimated hours
remaining.
As the
sprint progresses, you should see the estimated
hours trend downwards and it should be on pace so
all the committed work is accomplished in the
sprint.

Daily Scrum Meeting
Each day, your team should hold a Daily Scrum
Meeting.
In the
purest version of Scrum, this daily meeting is
restricted to 15 minutes and each team member is
asked 3 questions:
“What did you do
yesterday?”
“What will you do today?”
“Are there any roadblocks or anything impeding your
progress?”
In our experience,
15 minutes is not always enough time to have a good
dialog and a meaningful meeting.
Many days we
will complete this in 15 minutes, but most often it
takes about 30 to 45 minutes. To speed this up, we
have each team member post a summary of what they
did yesterday and a summary of what they plan to do
tomorrow in a daily discussion forum that is
automatically distributed to all team members (see
example below). This allows you
to spend the Daily Scrum meeting talking about
roadblocks, design decisions, and impediments to
progress.

What's Next?
Upcoming newsletters will discuss the following
topics:
-
Agile Scrum - Reporting and
Metrics
-
Agile Scrum - Retrospectives
-
Agile Scrum - Site specific
variants of Scrum
|
|
Helpful Templates
Below are some helpful
templates to aid you in developing software
solutions on-time and on-budget:
|
About the Author
Steve Miller is the President of Pragmatic Software
(http://www.PragmaticSW.com).
With over 23 years of experience, Steve has
extensive knowledge in project management, software
architecture and test design. Steve publishes a
monthly newsletter for companies that design and
develop software. You can read other newsletters at
http://www.PragmaticSW.com/Newsletters.asp.
|
|